Interconnected Der Banner

Interconnected distribution utilities

Bring DER on your network into your Control Room and manage the risks

The challenge

What makes high DER penetration hard to manage

Distribution utilities face compounding operational pressures as DER volumes grow. These are the core pain points driving urgency.

DERR Growth Icon

DER growth creates voltage, thermal and hosting capacity challenges.

Regulators Icon

Regulators, system operators and customers expect more operational control.

Network Augmentation Icon

Network augmentation is slow, costly and hard to scale, often causing connection queue challenges.

ADMS Icon

DER data is often delayed, expensive or trapped outside ADMS and SCADA workflows.

LV Solar Icon

LV-connected solar, battery and EV assets remain largely invisible to operations.

Multivendor-DER Icon

Multi-vendor DER fleets make integration complex, demanding OT/IT transition.

SwitchDin Solution

Connect, control and coordinate DER assets across portfolios

SwitchDin helps interconnected DSOs turn DER invisibility into operational control through a secure, standards-based communications and integration layer connecting multi-vendor solar, BESS, EV and dynamic load with existing DERMS, ADMS and SCADA workflows for real-time visibility, active control and network coordination.

What You Get

Say yes to more solar, battery and EV connections with confidence.

Support standards-based protocols — CSIP-AUS, IEEE 2030.5 and others — for DNSP-to-site communication.

Bring real-time DER visibility and control into your control room.

Deep and extensive experience to solve your engineering problems.

Defer costly network augmentation by managing DER flexibility.

Manage the OT/IT transition with a standards-based, vendor-agnostic integration layer.

Why SwitchDin

Built for this problem, proven at scale

These are the reasons distribution utilities choose SwitchDin over the alternatives.

01We solve your engineering problems regardless of market structure

SwitchDin can address DER integration challenges across different regulatory and market environments, drawing on deep technical experience.

02SwitchDin controls both sides of the DER connection

SwitchDin spans both the network operations layer and the on-site DER devices. One vendor for end-to-end DER risk management.

03Proven at Endeavour Energy — Australia's first Flexible Exports service

1,200+ sites managed in pilot. A live, at-scale reference for standards-based DER management on an interconnected distribution network.

04World-first CSIP-AUS implementation. 70+ DER manufacturer integrations

SwitchDin led the first CSIP-AUS deployment at scale. We support over 70 DER manufacturer integrations.

Proof Points

Deployed and delivering

Three active reference customers across Australia, each representing a different deployment context.

Proof logo icon

Australia's first Flexible Exports service

1,200+ sites managed in pilot. Flagship CSIP-AUS reference. The benchmark for standards-based DER management on an interconnected network.

Horizon power logo

Active DSO customer

'No refusals' DER mandate delivered across a diverse multi-vendor fleet. Active DER management enabling connection approvals that would otherwise be restricted.

AusNet logo

Active customer — PKI Service

Smart meter rollout complete. Growing DER fleet now under active management through SwitchDin's PKI-secured platform.

Fleet Section Background Image
CTA icon

Ready to bring DER into your operations?

Talk to the SwitchDin team about your network, your DER profile and the right starting point for your organisation.